Chapter 5: Illicit Discharge Detection and Elimination

Print
Press Enter to show all options, press Tab go to next option

Chapter 5:  Illicit Discharge Detection and Elimination (IDDE). (MCM #3)

This chapter addresses the following:

  • Identification and Mapping of Stormwater System
  • Illicit Discharge Prohibition Enforcement
  • Illicit Discharge Detection and Elimination
  • Identifying Priority Areas
  • Stormwater System and Outfall Map
  • Development and Implementation of Illicit Discharge Detection and Elimination (IDDE) Plan
  • Cure In Place Pipe
  • Pressure Washing and Impervious Surface Cleaning
  • IDDE Onsite Annual Inspections of: Commercial and Industrial Properties, City Owned Public Facilities and Stormwater Outfalls
  • Employee Training
  • Stormwater Sample Monitoring

Addendums referenced in this chapter:

ADDENDUM MCM #3-01 LAND DISTURBANCE, ILLICIT DISCHARGE & EROSION CONTROL ORDINANCE

ADDENDUM MCM #3-02 CHAPTER 14 NUISANCE ORDINANCE

ADDENDUM MCM #3-03 ILLICIT DISCHARGE DETECTION AND ELIMINATION PLAN (full draft)

ADDENDUM MCM #3-04 ORDINANCE CHAPTER 22-109 ILLEGAL PLACEMENT OF SEWER

ADDENDUM MCM #3-05 SAMPLE MUNICIPAL OPERATIONS STORMWATER INSPECTION REPORT AND LIST OF MUNICIPAL SITES

ADDENDUM MCM #3-06 SAMPLE ILLICIT DISCHARGE SITE INSPECTION REPORT AND LIST OF 745 SITES

ADDENDUM MCM #3-07 SAMPLE ILLICIT DISCHARGE OUTFALL INSPECTION REPORT AND LIST OF OUTFALLS

ADDENDUM MCM #3-08 CITY OF NIXA STORMWATER MAP

ADDENDUM MCM #3-09 WASTEWATER COLLECTION SYSTEM IMPROVEMENTS CIPP

ADDENDUM MCM #3-10 2012 IPC 301.3 CONNECTIONS TO DRAINAGE SYSTEM

ADDENDUM MCM #3-11 MUNICIPAL STORMWATER POLLUTION PREVENTION TRAINING PRESENTATION

ADDENDUM MCM #3-12 ONE & TWO FAMILY CONSTRUCTION SEDIMENT & EROSION CONTROL TRAINING

PRESENTATION

ADDENDUM MCM #3-13 AFTER THE STORM TRAINING PRESENTATION AND EPA MATERIAL

ADDENDUM MCM #3-14 BEST MANAGEMENT PRACTICES FOR PRESSURE WASHING AND IMPERVIOUS SURFACE CLEANING

ADDENDUM MCM #3-15 SAMPLE OEWRI LAB TESTING RESULTS